PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Cooper piping at the 1st floor bathroom 133-136 Facing North.jpg Erecting stone panels at the North Elevation 1.jpg Erecting stone panels at the North Elevation 2.jpg Installed damper controllers at the 1st floor Facing East.jpg Installed window frames at the 1st floor Attorneys Room Facing East.jpg Aligning the stone panels at the 2nd floor North Elevation.jpg Copper piping at the 2nd floor bathroom sinks Facing South.jpg Ductwork raiser at the 3rd floor Facing South-East.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg
Previous pageNext page Installed window frames at the 1st floor Attorneys Room Facing East
Installed window frames at the 1st floor Attorneys Room Facing East